top of page

Waterway protection, linking and restoration project

Periodic

CCMA funding enabled the fencing and re-vegetatation of a 5km stretch of the Woady Yaloak River which included an area of significant grasslands. The planting of 6000 tubestock protected habitat for threatened species such as the growling grass frog, and improves water quality in waterways and RAMSAR lakes by excluding stock and filtering runoff entering the river.

Waterway protection, linking and restoration project
Email Sig logo.png
bottom of page